VX Inventor
Sign in

Reference projects / Vertical-transmission wind turbineConditional feasibility

Reference project — read-only and public. Every number on these pages is computed live by the calculation engine from the stated design basis. Copy it into a project to change assumptions, resolve gaps and work with the agent.

Vertical-transmission wind turbine

A wind rotor drives a vertical shaft down the tower to staged, clutch-engaged generators at ground level.

Feasibility verdict (spec §06)

Conditional feasibility

All 15 mandatory calculations pass on the stated assumptions.

15 condition(s) before this can be called supported
  • G-01: Import the patent / design documents for the vertical transmission and the staged clutch arrangement.
  • G-02: Is the rotor a vertical-axis rotor on top of the tower, or a horizontal-axis rotor with a right-angle gear into the vertical shaft?
  • G-05: How does the magnet control the centrifugal clutch (hold shoes retracted, add engagement force, or release a latch)? Are thresholds set by speed or by power?
  • G-08: Prototype budget and the funding target.
  • A-01 must be confirmed: Rotor is a 3-blade H-type vertical-axis rotor, 3 m diameter × 4 m high, on top of the tower.
  • A-02 must be confirmed: Rotor power coefficient Cp = 0.30 at tip-speed ratio 3 (mid-range of published H-rotor tests).
  • A-03 must be confirmed: Site wind: annual mean 6 m/s at rotor height, Rayleigh distribution (no site data yet).
  • A-05 must be confirmed: Three 1.5 kW permanent-magnet generators behind a 6.5:1 speed-up stage.
  • A-07 must be confirmed: Allowable soil bearing 150 kPa, friction 0.45 (no geotechnical report).
  • A-11 must be confirmed: Clutch: a centrifugal shoe clutch whose engagement is held off or released by an electromagnet, so a controller can set the engagement threshold by power.
  • CALC-10: Static preliminary load: gust, dynamic and code load factors must be applied by the structural engineer
  • CALC-11: Basic life only: run the maker's calculator (a_ISO, lubrication, contamination) before selection
  • CALC-12: Lewis screening only: rate to AGMA 2001 / ISO 6336 (bending and contact) before selection
  • CALC-15: eccentricity 0.87 m exceeds B/6 = 0.58 m: part of the base lifts off the soil (allowed by some codes for wind, not for sustained loads)
  • CALC-16: Steel strength only: concrete breakout, pull-out and side-face blowout govern many tower anchorages (ACI 318 ch. 17)
17Requirements7 critical48Items in the structure25 parts · 13 interfaces15Calculations10 pass · 5 warn · 0 fail · 0 invalid9Open gaps4 blocking findings89Plan tasks610 h · 8 approval gates$114k–326kPrototype programmeNRE + first unit; estimate, not a quote

The invention

The rotor's torque travels down a vertical transmission shaft inside the tower to a ground-level generator house. There, a speed-up gear stage feeds a bank of generators that are engaged one at a time by magnetically controlled centrifugal clutches as the available power rises, so each engaged generator runs near its efficient load point, and every heavy, serviceable part sits at ground level instead of at the top of the tower.

Preliminary reference design built from stated assumptions. Import the patent and design documents to replace assumptions A-01, A-05 and A-11 before the architecture is locked.

Where it stands in the pipeline

  1. S1 Concept intake — 5 task(s), 22 h
    Concept brief and open-question register
  2. S2 Requirements and concept — 2 task(s), 20 h
    Requirements baseline and selected concept
  3. S3 Decomposition and plan — 3 task(s), 41 h
    Approved development plan
  4. S4 Preliminary engineering and sourcing — 40 task(s), 314 h
    Traceable preliminary design and assumptions
  5. S5 Simulation and feasibility — 20 task(s), 106 h
    Feasibility report and alternatives
  6. S6 Optimization and integration — 12 task(s), 53 h
    Recommended configuration and trade study
  7. S7 Costing and roadmap — 3 task(s), 20 h
    Costed development plan
  8. S8 Handoff and later validation — 4 task(s), 34 h
    Preliminary package, RFQs and test plan

Blocking items

All findings

Ask the design agent what to do next.