Reference projects / Vertical-transmission wind turbineConditional feasibility
Reference project — read-only and public. Every number on these pages is computed live by the calculation engine from the stated design basis. Copy it into a project to change assumptions, resolve gaps and work with the agent.
Gaps, assumptions and findings
The agent never silently invents dimensions, loads, allowables or supplier data: what is missing is a gap (blocking, assumable with bounded sensitivity, or deferred), and what is assumed says so.
Open questions
| Code | Question | Class | Discipline | Why it matters |
|---|---|---|---|---|
| G-01 | Import the patent / design documents for the vertical transmission and the staged clutch arrangement. | blocking | Systems engineering | Architecture (rotor type, power take-off layout, clutch mechanism) cannot be locked without them. |
| G-02 | Is the rotor a vertical-axis rotor on top of the tower, or a horizontal-axis rotor with a right-angle gear into the vertical shaft? Proposed: A-01: vertical-axis H-rotor | blocking | Aerodynamics and fluids | Changes rotor loads, yaw system, top gearbox and every downstream calculation. |
| G-03 | Where will the prototype stand? Site wind data (or a nearby met station) and the permitting authority. Proposed: A-03 and A-04 | assumable | Aerodynamics and fluids | AEP, extreme wind class and code jurisdiction depend on the site. |
| G-04 | Geotechnical report: allowable bearing, friction, frost depth, water table. Proposed: A-07: 150 kPa | assumable | Civil and geotechnical | Foundation size is sensitive to soil; preliminary sizing may assume, construction may not. |
| G-05 | How does the magnet control the centrifugal clutch (hold shoes retracted, add engagement force, or release a latch)? Are thresholds set by speed or by power? Proposed: A-11 | blocking | Mechanical / machine design | Sets the engagement law, slip energy and the controller design. |
| G-06 | Which generators: maker, rated speed, efficiency map, inertia? Proposed: A-05, A-06 | assumable | Electrical power | Part-load efficiency is the whole case for staging; it must come from measured maps. |
| G-07 | Grid-tied, battery-based or both? | deferred | Electrical power | Selects the inverter and the interconnection standards; does not change the mechanical design. |
| G-08 | Prototype budget and the funding target. | blocking | Cost and funding | Scopes the prototype and test plan. |
| G-09 | Local noise and setback limits. | deferred | Standards and compliance | Permitting condition, usually settled at site selection. |
Assumptions
| Code | Assumption | Value | Sensitivity | Affects | Status |
|---|---|---|---|---|---|
| A-01 | Rotor is a 3-blade H-type vertical-axis rotor, 3 m diameter × 4 m high, on top of the tower. | D 3 m, H 4 m, A 12 m² | high | 1.1, 1.2, 1.8, 1.9 | unapproved |
| A-02 | Rotor power coefficient Cp = 0.30 at tip-speed ratio 3 (mid-range of published H-rotor tests). | Cp 0.30, λ 3 | high | 1.1, 1.5 | unapproved |
| A-03 | Site wind: annual mean 6 m/s at rotor height, Rayleigh distribution (no site data yet). | 6 m/s, k = 2 | high | 1.1 | unapproved |
| A-04 | IEC 61400-2 class III: Vref 37.5 m/s, 50-year extreme Ve50 = 52.5 m/s. | Ve50 52.5 m/s | medium | 1.8, 1.9 | unapproved |
| A-05 | Three 1.5 kW permanent-magnet generators behind a 6.5:1 speed-up stage. | 3 × 1.5 kW, 6.5:1 | high | 1.4, 1.5 | unapproved |
| A-06 | Generator losses: 10 % at rated, 35 % of that fixed (core, friction, windage). | η 0.90, fixed share 0.35 | medium | 1.5 | unapproved |
| A-07 | Allowable soil bearing 150 kPa, friction 0.45 (no geotechnical report). | 150 kPa | high | 1.9 | unapproved |
| A-08 | Rotor centre 10 m above grade; tower Ø 0.4 m × 8 m. | 10 m | medium | 1.3, 1.8, 1.9 | unapproved |
| A-09 | Shaft: solid Ø 60 mm AISI 4140 Q&T in three segments; torque ripple ±50 % of mean (2-blade-pass excitation of a VAWT). | Ø 60 mm, ripple 0.5 | medium | 1.3 | unapproved |
| A-10 | Parked rotor drag coefficient 1.2 on projected area (conservative). | C_T 1.2 | medium | 1.8, 1.9 | unapproved |
| A-11 | Clutch: a centrifugal shoe clutch whose engagement is held off or released by an electromagnet, so a controller can set the engagement threshold by power. | — | high | 1.5.1, 1.5.4 | unapproved |
Design review findings
Blocking 4
- blocking G-01: Import the patent / design documents for the vertical transmission and the staged clutch arrangement.
- blocking G-02: Is the rotor a vertical-axis rotor on top of the tower, or a horizontal-axis rotor with a right-angle gear into the vertical shaft?
- blocking G-05: How does the magnet control the centrifugal clutch (hold shoes retracted, add engagement force, or release a latch)? Are thresholds set by speed or by power?
- blocking G-08: Prototype budget and the funding target.
Warnings 19
- assumable G-03: Where will the prototype stand? Site wind data (or a nearby met station) and the permitting authority.
- assumable G-04: Geotechnical report: allowable bearing, friction, frost depth, water table.
- assumable G-06: Which generators: maker, rated speed, efficiency map, inertia?
- completeness 1.1.3 Rotor hub has no parts yet: decompose it to a testable work package or mark it bought.
- completeness 1.2.3 Bearing housing, seals and lubrication has no parts yet: decompose it to a testable work package or mark it bought.
- completeness 1.4.2 Power take-off to generator branches has no parts yet: decompose it to a testable work package or mark it bought.
- completeness 1.5.4 Clutch magnet drivers and engagement controller has no parts yet: decompose it to a testable work package or mark it bought.
- completeness 1.7.1 Supervisory controller has no parts yet: decompose it to a testable work package or mark it bought.
- completeness 1.8.1 Tubular steel tower, flanged sections has no parts yet: decompose it to a testable work package or mark it bought.
- completeness 1.8.4 Service access: hatch, climbing / tower-lowering provision has no parts yet: decompose it to a testable work package or mark it bought.
- completeness 1.10.1 Weatherproof generator house has no parts yet: decompose it to a testable work package or mark it bought.
- assumable High-sensitivity assumption A-01 not yet approved: Rotor is a 3-blade H-type vertical-axis rotor, 3 m diameter × 4 m high, on top of the tower.
- assumable High-sensitivity assumption A-02 not yet approved: Rotor power coefficient Cp = 0.30 at tip-speed ratio 3 (mid-range of published H-rotor tests).
- assumable High-sensitivity assumption A-03 not yet approved: Site wind: annual mean 6 m/s at rotor height, Rayleigh distribution (no site data yet).
- assumable High-sensitivity assumption A-05 not yet approved: Three 1.5 kW permanent-magnet generators behind a 6.5:1 speed-up stage.
- assumable High-sensitivity assumption A-07 not yet approved: Allowable soil bearing 150 kPa, friction 0.45 (no geotechnical report).
- assumable High-sensitivity assumption A-11 not yet approved: Clutch: a centrifugal shoe clutch whose engagement is held off or released by an electromagnet, so a controller can set the engagement threshold by power.
- traceability REQ-ENV-002 is not allocated to any part of the structure (orphan requirement).
- traceability REQ-COST-001 is not allocated to any part of the structure (orphan requirement).
Information 38
- deferred G-07: Grid-tied, battery-based or both?
- deferred G-09: Local noise and setback limits.
- evidence 1.4.3 Gearbox lubricant has no sizing method, standard or catalogue component behind it.
- evidence 1.9.4 Base-plate grout has no sizing method, standard or catalogue component behind it.
- completeness Interface I-01 (rotational) not yet defined: Rotor hub to top shaft segment: torque, weight and rotor bending moment.
- completeness Interface I-02 (structural) not yet defined: Top bearing housing to tower top: radial rotor loads and weight into the tower.
- completeness Interface I-04 (structural) not yet defined: Steady bearings to tower brackets: radial support only.
- completeness Interface I-05 (rotational) not yet defined: Shaft bottom to gearbox input (coupling, axial float allowance for thermal growth of the long shaft).
- completeness Interface I-06 (rotational) not yet defined: Power take-off to each clutch.
- completeness Interface I-08 (signal) not yet defined: Magnet driver command to each clutch; engagement state feedback.
- completeness Interface I-09 (electrical) not yet defined: Generator AC to rectifiers / DC bus.
- completeness Interface I-10 (signal) not yet defined: Brake release / apply and overspeed trip.
- completeness Interface I-11 (structural) not yet defined: Base plate to anchor rods: tension, compression and shear.
- completeness Interface I-12 (structural) not yet defined: Footing to soil: bearing pressure, sliding resistance.
- completeness Interface I-13 (thermal) not yet defined: Generator and gearbox heat rejected from the house.
- evidence CALC-01 rests on assumed values: rotor_diameter, rotor_height, v_rated, tsr.
- evidence CALC-02 rests on assumed values: rotor_diameter, rotor_height, mean_wind, tsr.
- evidence CALC-03 rests on assumed values: mean_wind, weibull_k, v_cut_in, v_rated, v_cut_out, eta_gen.
- evidence CALC-04 rests on assumed values: gear_ratio, bearing_loss, n_gen, p_gen, eta_gen, gen_fixed_share.
- evidence CALC-05 rests on assumed values: gear_ratio, bearing_loss, n_gen, p_gen, eta_gen, gen_fixed_share.
- completeness CALC-07: fatigue (DE-Goodman) has 24.9× capacity against 1.2 required — possible overdesign; consider a lighter or cheaper option (other checks may govern).
- completeness CALC-07: first-cycle yield has 42.6× capacity against 1.2 required — possible overdesign; consider a lighter or cheaper option (other checks may govern).
- evidence CALC-07 rests on assumed values: shaft_d, shaft_bending, torque_ripple.
- evidence CALC-08 rests on assumed values: shaft_span_supported, shaft_d, overspeed.
- evidence CALC-10 rests on assumed values: ct_parked, rotor_center_height, tower_diameter, tower_height.
- completeness CALC-11: rating life has 4.86× capacity against 1 required — possible overdesign; consider a lighter or cheaper option (other checks may govern).
- completeness CALC-11: static safety has 4.44× capacity against 1 required — possible overdesign; consider a lighter or cheaper option (other checks may govern).
- evidence CALC-11 rests on assumed values: v_rated, rotating_weight.
- evidence CALC-12 rests on assumed values: gear_ratio.
- completeness CALC-13: clutch torque capacity has 9.62× capacity against 1.2 required — possible overdesign; consider a lighter or cheaper option (other checks may govern).
- evidence CALC-13 rests on assumed values: gen_inertia, gear_ratio, clutch_capacity.
- completeness CALC-14: slip (friction grip) has 18.8× capacity against 1.2 required — possible overdesign; consider a lighter or cheaper option (other checks may govern).
- evidence CALC-14 rests on assumed values: flange_bcd.
- evidence CALC-15 rests on assumed values: footing_b, footing_d, soil_cover, dead_load, q_allow, soil_mu.
- completeness CALC-16: anchor shear (steel) has 44× capacity against 1.2 required — possible overdesign; consider a lighter or cheaper option (other checks may govern).
- evidence CALC-16 rests on assumed values: anchor_n, bolt_circle, dead_load.
- evidence 30 referenced standard(s) not yet acquired or edition-checked: IEC 61400-2, IEC 61400-12-1, ANSI/AISC 360, AWS D1.1, ISO 898-1, VDI 2230 Part 1, ISO 281, ISO 76, ISO 286-1/-2, DIN 743, ISO 21940-11, ANSI/AGMA 2001-D04, ISO 6336-1/-2/-3, ANSI/AGMA/AWEA 6006, IEC 60034-1/-2-1, IEC 60204-1, IEC 61000 series, ISO 13849-1/-2, ISO 12100, UL 1741, IEEE 1547, NFPA 70 (NEC) Art. 690, 694, 705, IEC 60529, ISO 20816-1/-21, ASCE/SEI 7, 29 CFR 1910 / 1926, ACI 318, International Building Code (as adopted locally), ASTM A615 / A706, ASTM F1554.
- completeness 2 electronics item(s) to hand off to VX Design: Clutch magnet drivers and engagement controller; Supervisory controller.