Reference projects / Vertical-transmission wind turbineConditional feasibility

Reference project — read-only and public. Every number on these pages is computed live by the calculation engine from the stated design basis. Copy it into a project to change assumptions, resolve gaps and work with the agent.

Feasibility

Feasibility verdict (spec §06)

Conditional feasibility

All 15 mandatory calculations pass on the stated assumptions.

15 condition(s) before this can be called supported
  • G-01: Import the patent / design documents for the vertical transmission and the staged clutch arrangement.
  • G-02: Is the rotor a vertical-axis rotor on top of the tower, or a horizontal-axis rotor with a right-angle gear into the vertical shaft?
  • G-05: How does the magnet control the centrifugal clutch (hold shoes retracted, add engagement force, or release a latch)? Are thresholds set by speed or by power?
  • G-08: Prototype budget and the funding target.
  • A-01 must be confirmed: Rotor is a 3-blade H-type vertical-axis rotor, 3 m diameter × 4 m high, on top of the tower.
  • A-02 must be confirmed: Rotor power coefficient Cp = 0.30 at tip-speed ratio 3 (mid-range of published H-rotor tests).
  • A-03 must be confirmed: Site wind: annual mean 6 m/s at rotor height, Rayleigh distribution (no site data yet).
  • A-05 must be confirmed: Three 1.5 kW permanent-magnet generators behind a 6.5:1 speed-up stage.
  • A-07 must be confirmed: Allowable soil bearing 150 kPa, friction 0.45 (no geotechnical report).
  • A-11 must be confirmed: Clutch: a centrifugal shoe clutch whose engagement is held off or released by an electromagnet, so a controller can set the engagement threshold by power.
  • CALC-10: Static preliminary load: gust, dynamic and code load factors must be applied by the structural engineer
  • CALC-11: Basic life only: run the maker's calculator (a_ISO, lubrication, contamination) before selection
  • CALC-12: Lewis screening only: rate to AGMA 2001 / ISO 6336 (bending and contact) before selection
  • CALC-15: eccentricity 0.87 m exceeds B/6 = 0.58 m: part of the base lifts off the soil (allowed by some codes for wind, not for sustained loads)
  • CALC-16: Steel strength only: concrete breakout, pull-out and side-face blowout govern many tower anchorages (ACI 318 ch. 17)

Classes (spec §06): supported preliminary feasibility · conditional feasibility · infeasible under stated assumptions · insufficient evidence. A design is never marked feasible because it meets cost or performance targets while a mandatory criterion fails, and independent specialist review is required before safety-critical use.

Critical requirements

RequirementEvidenceStatus
REQ-PERF-001 Rated electrical output at 12 m/s hub wind speed.CALC-01 (pass)CALC-04 (pass)CALC-06 (pass)assumed
REQ-PERF-003 Staged generator engagement shall raise part-load conversion efficiency compared with one generator of the same total rating.CALC-02 (pass)CALC-05 (pass)CALC-13 (pass)assumed
REQ-PERF-004 Annual energy production shall be reported against conventional geared and direct-drive baselines with the same rotor.CALC-03 (pass)assumed
REQ-SAFE-001 Survive the 50-year extreme wind parked without structural failure.CALC-10 (warn)CALC-14 (pass)assumed
REQ-SAFE-002 A fail-safe brake shall stop and hold the rotor on overspeed or loss of load/grid.test planned (S8 test plan)test planned
REQ-INT-001 The vertical shaft shall run clear of its bending critical speeds.CALC-08 (pass)assumed
REQ-STR-001 The foundation shall resist overturning and sliding and stay within allowable soil bearing.CALC-15 (warn)CALC-16 (warn)assumed

Results at a glance

CalculationKey resultsGoverning check
CALC-01 Rotor power, speed and torque at rated windSwept area: 12 m² · Power in the wind (Cp = 1): 12.7 kW · Rotor shaft power: 3.81 kW—pass
CALC-02 Rotor power at the site mean wind (part load)Swept area: 12 m² · Power in the wind (Cp = 1): 1.588 kW · Rotor shaft power: 0.4763 kW—pass
CALC-03 Annual energy production at the siteWeibull scale c: 6.77 m/s · Rated rotor power: 3.81 kW · Mean electrical power: 0.6661 kW—pass
CALC-04 Staged generator bank at rated powerPower at generator shaft: 3.618 kW · Generators engaged: 3 · Load on each engaged generator: 80.39 %—pass
CALC-05 Staged generator bank at part load: staged vs one generatorPower at generator shaft: 0.4172 kW · Generators engaged: 1 · Load on each engaged generator: 27.82 %—pass
CALC-06 Energy balance at rated: no output beyond inputImplied efficiency: 85.85 % · Unaccounted losses: 4.00e-5 kWoutput within input less known losses 1 vs 1pass
CALC-07 Vertical shaft fatigue at rated torque with 2P ripplevon Mises alternating stress σa': 6.84 MPa · von Mises mean stress σm': 9.725 MPa · Corrected endurance limit Se: 227.6 MPafatigue (DE-Goodman) 24.9 vs 1.2pass
CALC-08 Shaft critical speed with two steady bearings (3 spans)First critical speed: 663.4 rpm · Critical / running speed: 2.227 · Longest span keeping the margin: 4.404 mcritical-speed separation 2.23 vs 1.25pass
CALC-10 Parked extreme wind on rotor and towerVelocity pressure: 1,688 Pa · Rotor force: 24.31 kN · Tower force: 6.483 kN—warn
CALC-11 Top bearing life (weight + operating radial load) and static safety at extreme windEquivalent dynamic load P: 14.24 kN · Basic rating life L10: 6,687 Mrev · Basic rating life L10h: 486,300 hstatic safety 4.44 vs 1warn
CALC-12 Speed-up stage pinion bending (screening)Pitch diameter: 54 mm · Tangential load Wt: 1,357 N · Pitch-line velocity: 4.212 m/stooth bending 3.03 vs 1.2warn
CALC-13 Clutch engagement onto a stationary generatorTorque needed: 3.12 N·m · Slip heat per engagement: 0.365 kJ · Plate temperature rise per engagement: 0.7935 Kclutch torque capacity 9.62 vs 1.2pass
CALC-14 Tower base flange bolts under parked extreme windTensile stress area As: 352.5 mm² · Proof load per bolt: 292.6 kN · Preload per bolt: 204.8 kNjoint separation 2.44 vs 1.2pass
CALC-15 Spread footing: overturning, sliding, soil bearingFooting weight: 231.3 kN · Soil cover weight: 110.3 kN · Total stabilising vertical load: 356.5 kNoverturning 2.02 vs 1.5warn
CALC-16 Anchor rods: steel strength under factored extreme windPeak anchor tension: 111 kN · Shear per anchor: 2.566 kN · Design tensile strength φNsa: 217.4 kNanchor tension (steel) 1.96 vs 1.2warn

What would change the verdict