Reference projects / Solar HiveConditional feasibility

Reference project — read-only and public. Every number on these pages is computed live by the calculation engine from the stated design basis. Copy it into a project to change assumptions, resolve gaps and work with the agent.

Solar Hive

Modular hexagonal solar cells clustered on a tracking mast (placeholder reading — import the invention's description).

Feasibility verdict (spec §06)

Conditional feasibility

All 5 mandatory calculations pass on the stated assumptions.

9 condition(s) before this can be called supported
  • G-01: Import the Solar Hive description, sketches or patent: what does it do differently from a conventional array?
  • G-02: Custom hexagonal laminates, or standard certified modules in hexagonal frames?
  • A-01 must be confirmed: PLACEHOLDER: 'hive' = 7 hexagonal PV cells around a central hub on a dual-axis tracking mast.
  • A-02 must be confirmed: Active cell area 10 m² at 21.5 % module efficiency.
  • A-03 must be confirmed: Site: 4.5 peak sun hours fixed tilt; dual-axis tracking raises this to ≈ 6.0.
  • A-05 must be confirmed: Allowable soil bearing 150 kPa, friction 0.45.
  • CALC-03: Static preliminary load: gust, dynamic and code load factors must be applied by the structural engineer
  • CALC-04: Preliminary: site-specific geotechnical report and code load combinations required (ACI 318, ASCE 7, local building code)
  • CALC-05: Steel strength only: concrete breakout, pull-out and side-face blowout govern many tower anchorages (ACI 318 ch. 17)
8Requirements5 critical19Items in the structure12 parts · 5 interfaces5Calculations2 pass · 3 warn · 0 fail · 0 invalid4Open gaps2 blocking findings45Plan tasks329 h · 8 approval gates$60k–175kPrototype programmeNRE + first unit; estimate, not a quote

The invention

A cluster of hexagonal PV 'cells' — modules in hexagonal frames — mounted around a central mast on a dual-axis tracking head, so modules can be added like cells of a hive and the whole cluster follows the sun. This is a placeholder architecture: it exists to exercise the solar standards, structural and energy methods until the Solar Hive's own documents are imported.

Placeholder architecture (A-01). The plan cannot be approved until gap G-01 is closed with the inventor's description.

Where it stands in the pipeline

  1. S1 Concept intake — 3 task(s), 14 h
    Concept brief and open-question register
  2. S2 Requirements and concept — 2 task(s), 20 h
    Requirements baseline and selected concept
  3. S3 Decomposition and plan — 3 task(s), 27 h
    Approved development plan
  4. S4 Preliminary engineering and sourcing — 18 task(s), 162 h
    Traceable preliminary design and assumptions
  5. S5 Simulation and feasibility — 6 task(s), 25 h
    Feasibility report and alternatives
  6. S6 Optimization and integration — 6 task(s), 35 h
    Recommended configuration and trade study
  7. S7 Costing and roadmap — 3 task(s), 20 h
    Costed development plan
  8. S8 Handoff and later validation — 4 task(s), 26 h
    Preliminary package, RFQs and test plan

Blocking items

All findings