Reference projects / Solar HiveConditional feasibility

Reference project — read-only and public. Every number on these pages is computed live by the calculation engine from the stated design basis. Copy it into a project to change assumptions, resolve gaps and work with the agent.

Feasibility

Feasibility verdict (spec §06)

Conditional feasibility

All 5 mandatory calculations pass on the stated assumptions.

9 condition(s) before this can be called supported
  • G-01: Import the Solar Hive description, sketches or patent: what does it do differently from a conventional array?
  • G-02: Custom hexagonal laminates, or standard certified modules in hexagonal frames?
  • A-01 must be confirmed: PLACEHOLDER: 'hive' = 7 hexagonal PV cells around a central hub on a dual-axis tracking mast.
  • A-02 must be confirmed: Active cell area 10 m² at 21.5 % module efficiency.
  • A-03 must be confirmed: Site: 4.5 peak sun hours fixed tilt; dual-axis tracking raises this to ≈ 6.0.
  • A-05 must be confirmed: Allowable soil bearing 150 kPa, friction 0.45.
  • CALC-03: Static preliminary load: gust, dynamic and code load factors must be applied by the structural engineer
  • CALC-04: Preliminary: site-specific geotechnical report and code load combinations required (ACI 318, ASCE 7, local building code)
  • CALC-05: Steel strength only: concrete breakout, pull-out and side-face blowout govern many tower anchorages (ACI 318 ch. 17)

Classes (spec §06): supported preliminary feasibility · conditional feasibility · infeasible under stated assumptions · insufficient evidence. A design is never marked feasible because it meets cost or performance targets while a mandatory criterion fails, and independent specialist review is required before safety-critical use.

Critical requirements

RequirementEvidenceStatus
REQ-PERF-001 Rated DC output of the prototype cluster.CALC-01 (pass)assumed
REQ-PERF-002 Annual energy shall be compared with a fixed-tilt array using the same modules.CALC-01 (pass)CALC-02 (pass)assumed
REQ-SAFE-001 Survive the design wind in stow position.CALC-03 (warn)assumed
REQ-SAFE-002 Stow automatically above a set wind speed and on loss of power.test planned (S8 test plan)test planned
REQ-STR-001 The mast foundation shall resist overturning and sliding within allowable soil bearing.CALC-04 (warn)CALC-05 (warn)assumed

Results at a glance

CalculationKey resultsGoverning check
CALC-01 Cluster output at peak sun, tracked annual energyCell temperature: 56.25 °C · Rated DC power at STC: 2.15 kW · DC output at this condition: 1.915 kW—pass
CALC-02 Same modules on a fixed-tilt baselineCell temperature: 56.25 °C · Rated DC power at STC: 2.15 kW · DC output at this condition: 1.915 kW—pass
CALC-03 Design wind on the stowed cluster and mastVelocity pressure: 1,531 Pa · Rotor force: 7.166 kN · Tower force: 1.488 kN—warn
CALC-04 Mast pad: overturning, sliding, bearingFooting weight: 66.08 kN · Soil cover weight: 28.8 kN · Total stabilising vertical load: 102.9 kNoverturning 3.09 vs 1.5warn
CALC-05 Mast anchor rods (steel strength)Peak anchor tension: 25.47 kN · Shear per anchor: 1.082 kN · Design tensile strength φNsa: 94.92 kNanchor tension (steel) 3.73 vs 1.2warn

What would change the verdict