VX Inventor · preliminary feasibility package · 2026-11-25

Solar Hive

Modular hexagonal solar cells clustered on a tracking mast (placeholder reading — import the invention's description).

1. Executive concept brief

A cluster of hexagonal PV 'cells' — modules in hexagonal frames — mounted around a central mast on a dual-axis tracking head, so modules can be added like cells of a hive and the whole cluster follows the sun. This is a placeholder architecture: it exists to exercise the solar standards, structural and energy methods until the Solar Hive's own documents are imported.

Function
Generate electricity from sunlight with a modular, expandable cluster that tracks the sun.
Environment
Outdoor, ground-mounted, −20 to +45 °C, wind and snow per local code.
Scale
Prototype: 7 hexagonal cells, ≈ 10 m² active area (assumed).
Budget
Not yet stated.

2. Feasibility

Conditional feasibility. All 5 mandatory calculations pass on the stated assumptions.

3. Requirements

REQ-PERF-001Rated DC output of the prototype cluster.≥ 2 kW DC at STCassumed
REQ-PERF-002Annual energy shall be compared with a fixed-tilt array using the same modules.kWh/kWp with uncertaintyassumed
REQ-SAFE-001Survive the design wind in stow position.ASCE 7 basic wind speed for the site (assumed 50 m/s)assumed
REQ-SAFE-002Stow automatically above a set wind speed and on loss of power.stow ≤ 90 s from triggertest planned
REQ-STR-001The mast foundation shall resist overturning and sliding within allowable soil bearing.FS ≥ 1.5; q ≤ q_allowassumed
REQ-MOD-001Cells shall be added or replaced without disturbing neighbouring cells.one cell swap ≤ 30 mintest planned
REQ-REG-001Modules, racking and inverter listed for the jurisdiction.IEC 61215/61730, UL 2703/3703, UL 1741, NEC 690test planned
REQ-LIFE-001Design life.25 years (modules), 20 years (tracker drives)none

4. Product structure

1Solar Hive cluster (placeholder architecture)Systems engineeringtbd
1.1Hexagonal PV cellsElectrical powertbd
1.1.1PV laminates cut / built to hexagonal format ×7Electrical powertbd
1.1.2Hexagonal cell frames ×7Structuralmake
1.1.3Cell-to-hub quick connectors ×7Mechanical / machine designmake
1.1.4DC wiring, connectors and bondingElectrical powerbuy
1.2Tracking headMechanical / machine designtbd
1.2.1Azimuth slew driveMechanical / machine designbuy
1.2.2Elevation actuatorMechanical / machine designbuy
1.2.3Hub slewing bearingMechanical / machine designbuy
1.2.4Tracker controller with wind-stowElectronics / PCB (VX Design)make
1.3MastStructuraltbd
1.3.1Steel mast tubeStructuralmake
1.3.2Mast base plate and flange boltsStructuralmake
1.4FoundationCivil and geotechnicaltbd
1.4.1Reinforced-concrete padCivil and geotechnicalmake
1.4.2Anchor rods ×8Structuralbuy
1.5Power conversion and interconnectionElectrical powertbd
1.5.1Microinverters or string inverter with MLPEElectrical powerbuy

5. Engineering calculations

CALC-01Cluster output at peak sun, tracked annual energyCell temperature 56.25 °C; Rated DC power at STC 2.15 kW; DC output at this condition 1.915 kWpass
CALC-02Same modules on a fixed-tilt baselineCell temperature 56.25 °C; Rated DC power at STC 2.15 kW; DC output at this condition 1.915 kWpass
CALC-03Design wind on the stowed cluster and mastVelocity pressure 1,531 Pa; Rotor force 7.166 kN; Tower force 1.488 kNwarn
CALC-04Mast pad: overturning, sliding, bearingFooting weight 66.08 kN; Soil cover weight 28.8 kN; Total stabilising vertical load 102.9 kNwarn
CALC-05Mast anchor rods (steel strength)Peak anchor tension 25.47 kN; Shear per anchor 1.082 kN; Design tensile strength φNsa 94.92 kNwarn

6. Assumptions and open questions

7. Risks

8. Cost and roadmap

Unit cost $8,165–$24,265; NRE $52,108–$150,530 incl. contingency. Prototype: $60,273–$174,795; Pilot: $47,587–$141,421; Production: $277,348–$824,233. Estimates, not quotes (2026-11-25).

S1 Concept intakeConcept brief and open-question register14 h
S2 Requirements and conceptRequirements baseline and selected concept20 h
S3 Decomposition and planApproved development plan27 h
S4 Preliminary engineering and sourcingTraceable preliminary design and assumptions162 h
S5 Simulation and feasibilityFeasibility report and alternatives25 h
S6 Optimization and integrationRecommended configuration and trade study35 h
S7 Costing and roadmapCosted development plan20 h
S8 Handoff and later validationPreliminary package, RFQs and test plan26 h

Exclusions: Full certification testing; Land, grid-connection fees; Taxes and duties; Patent prosecution; Operating and maintenance costs (reported separately once a duty cycle is agreed).